This is an archive of information released in the past.
Disclaimer: It may contain broken links or outdated information. Some parts may not function in current web browsers.
*Visit https://humans-in-space.jaxa.jp/en/ for the latest information.
After removed from the Kibo's Exposed Facility(EF) by the JEM Remote Manipulator System (JEMRMS), the Exposed Pallet (EP) was handed over to the station's robotic arm (Space Station Remote Manipulator System: SSRMS).
At 11:29 p.m. (2:29 p.m. UTC), August 25, the CALET on the EP was transferred by the Kibo's robotic arm (JEMRMS) and installed to the Kibo's Exposed Facility (EF).
From 11:27 a.m. (2:27 a.m. UTC), August 25, the removal of the HTV5 Exposed Pallet (EP) on the Unpressurized Logistics Carrier (ULC) was started by the Space Station Remote Manipulator System (SSRMS).
All cables between KOUNOTORI5 and Harmony were connected. KOUNOTORI5's berthing operation was completed at 2:28 a.m., August 25 (5:28 p.m., August 24 UTC).
The Common Berthing Mechanism (CBM) between KOUNOTORI5 and Harmony was fastened with the bolts at 11:58 p.m. (2:58 p.m. UTC), August 24.
KOUNOTORI5 was grappled by the station's robotic arm (Space Station Remote Manipulator System: SSRMS) at 7:29 p.m. (10:29 a.m. UTC), August 24.
Copyright 2007 Japan Aerospace Exploration Agency | Site Policy |