This is an archive of information released in the past.

Disclaimer: It may contain broken links or outdated information. Some parts may not function in current web browsers.
*Visit https://humans-in-space.jaxa.jp/en/ for the latest information.

SiteMap

Japan Aerospace Exploration Agency:JAXA
  • NASA TV
  • contact us
  • Japanese

H-II Transfer Vehicle KOUNOTORI (HTV)

News

*All times are Japan Standard Time (JST)

ISS Crew Concludes KOUNOTORI5 Berthing Operations

ISS Crew Concludes KOUNOTORI5 Berthing Operations (August 25, 2015)

All cables between KOUNOTORI5 and Harmony were connected. KOUNOTORI5's berthing operation was completed at 2:28 a.m., August 25 (5:28 p.m., August 24 UTC).

KOUNOTORI5 being Fastened to Harmony with the CBM Bolts

KOUNOTORI5 being Fastened to Harmony with the CBM Bolts (August 25, 2015)

The Common Berthing Mechanism (CBM) between KOUNOTORI5 and Harmony was fastened with the bolts at 11:58 p.m. (2:58 p.m. UTC), August 24.

SSRMS Captures KOUNOTORI5

SSRMS Captures KOUNOTORI5 (August 24, 2015)

KOUNOTORI5 was grappled by the station's robotic arm (Space Station Remote Manipulator System: SSRMS) at 7:29 p.m. (10:29 a.m. UTC), August 24.

Coverage of the KOUNOTORI5's rendezvous and grapple has begun

Coverage of the KOUNOTORI5's rendezvous and grapple has begun (August 24, 2015)

Coverage of the KOUNOTORI5's rendezvous and grapple has begun.

KOUNOTORI5 Completes the Third Height Adjustment Maneuver

KOUNOTORI5 Completes the Third Height Adjustment Maneuver (August 24, 2015)

KOUNOTORI5 completed its third Height Adjustment Maneuver at 3:12 p.m. (6:12 a.m. UTC), August 24.

KOUNOTORI5 Completes the Second Height Adjustment Maneuver

KOUNOTORI5 Completes the Second Height Adjustment Maneuver (August 24, 2015)

KOUNOTORI5 completed its second Height Adjustment Maneuver at 0:07 p.m. (3:07 a.m. UTC), August 24.

 
Copyright 2007 Japan Aerospace Exploration Agency Site Policy