This is an archive of information released in the past. Disclaimer: It may contain broken links or outdated information. Some parts may not function in current web browsers.
 
ISS TopJAXA Top  sitemap
 
Photo Album -Before Launch (2)-

Jan. 11-14. 2000 (EST)
Terminal Countdown Demonstration Test (TCDT)
(NASA Kennedy Space Center)
Day 4
Jan. 14
At the 195-foot level of the Fixed Service Structure on Launch Pad 39A, the STS-99 crew pose for a photograph during Terminal Countdown Demonstration Test (TCDT) activities.
At Launch Pad 39A, STS-99 Mission Specialists Mamoru Mohri (Ph.D.), who is with the National Space Development Agency (NASDA) of Japan, and Janice Voss (Ph.D.) practice emergency egress procedures in a slidewire basket.
STS-99 Mission Specialist Mamoru Mohri (Ph.D.), who is with the National Space Development Agency (NASDA) of Japan, suits up in the Operations and Checkout Building, as part of a flight crew equipment fit check, prior to his trip to Launch Pad 39A.
The STS-99 crew leave the Operations and Checkout Building on their way to Launch Pad 39A and a simulated countdown exercise.
Day 3
Jan. 13
In the bunker at Launch Pad 39A, the STS-99 crew try on oxygen masks.
At the 195-foot level on the Fixed Service Structure, Launch Pad 39A, the STS-99 crew receive instructions about emergency egress.
Near the bunker at Launch Pad 39A, STS-99 Mission Specialists Janice Voss (Ph.D.), Gerhard Thiele and Mamoru Mohri check out the slidewire basket used for emergency egress.
At Launch Pad 39A, members of the STS-99 crew and others look over part of the safety equipment.
Inside the White Room attached to the Fixed Service Structure on Launch Pad 39A, STS-99 Commander Kevin Kregel gets ready to place a sign identifying the mission at the entrance to the orbiter Endeavour.
Inside the White Room attached to the Fixed Service Structure on Launch Pad 39A, the STS-99 crew pose at the entrance to the orbiter Endeavour.
At the 167-foot level of the Fixed Service Structure on Launch Pad 39A,
The STS-99 crew take time out during Terminal Countdown Demonstration Test (TCDT) activities to talk to the media.
In the Operations and Checkout Building, STS-99 Mission Specialist Mamoru Mohri, who is with the National Space Development Agency (NASDA) of Japan, gets help from suit technicians during flight crew equipment fit check prior to his trip to Launch Pad 39A.
Day 2
Jan .12
STS-99 Mission Specialist Mamoru Mohri, who is with the National Space Development Agency (NASDA) of Japan, smiles during training on the M-113, an armored personnel carrier that is part of emergency egress training during Terminal Countdown Demonstration Test (TCDT) activities.
Day 1
Jan. 11
The STS-99 crew pose for a photo after their arrival at KSC's Shuttle Landing Facility.
After their arrival at the Shuttle Landing Facility, the STS-99 crew talk to the media. At the microphone is Mission Specialist Mamoru Mohri, who is with the National Space Development Agency (NASDA) of Japan.
After their arrival at the Shuttle Landing Facility aboard T-38 training jet aircraft (background), the STS-99 crew talk to the media.
STS-99 Mission Specialist Mamoru Mohri, who is with the National Space Development Agency (NASDA) of Japan, waves after his arrival at KSC aboard a T-38 training jet aircraft to take part in a Terminal Countdown Demonstration Test (TCDT).


Last Updated : May 29, 2001

JAXA Top Site Policy